The contractor is only to use its own forces and or owner construction manager approved sub trades to undertake.
Overhead door scope of work.
The work consists of installing new embassy supplied doors and windows at 65 leyard s road a us embassy owned property.
Maintain any professional licenses required to perform the work outlined in this request for proposal.
Inspect equipment and adjust as needed.
Inspect equipment for damaged missing or worn parts.
Work the term work includes all labor materials equipment and services required of the contractor as shown described or inferred in the contract documents.
Shall be responsible for installation and making of all connections for each overhead door to be safe and operable.
Scope of work doors hardware alder street project 1 1 general a.
Four visits per year 1.
Scope of work to install doors windows at 65 leyard s road.
Access to the fire trucks and associated.
Construction shall abide by embassy rules and regulations including security and safety regulations.
The door opening should be reinforced studs for installation of the door frame.
Work will need to be coordinated with the facilities department public works garage and fire stations so operations are not affected.
The work shall include but shall not necessarily be limited to the following.
All the work shall be in accordance with recognized us and international building and construction codes.
Lube all moving parts.
Install the new wall as per the drawings below wall type 2 up to the bottom of structure including 2 layers of 12 mm gypsum board 100 mm sound attenuation insulation.
Supply and install hp door opener for all garage overhead doors c w 2 remotes 3.
This contract will be issued for overhead door repair and replacement work.
Texas overhead door s preventative maintenance program call today for details.
The size and scope of services will not exceed 50 000 00 per project or 15 000 00 for alteration repair or renovations.
Scope of work includes.
Supply and install 16 x 7 four section non insulated overhead garage doors with 4 panels of glazing as per the plan and door schedule details 2.
Install a new lh door and door frame provided by the embassy.
Overhead doors rolling shutters description designer owner nrb g c others specify comments.
Replace any damaged missing or worn hardware.
Provide all vehicles lifts and tools needed for the work.
Work check list this detailed scope of work document can be used to ensure all elements of the modular off site construction project are captured and assigned to the project team including owner design professionals modular company general.
Scope of work the contractor should furnish everything needed to perform all of the requirements of this contract including without limitation all labour supervision tools materials equipment transportation permits licenses and supervision to maintain and repair and make alterations to these doors.
Replace hardware as needed.